Prestige Falcon City Chennai Construction Status


Prestige Falcon City Chennai Construction Status - Aerial view of construction site with heavy machinery and tower silhouettes

The Prestige Falcon City Chennai construction status is currently in the pre-launch stage. Heavy machinery is fully ready on the 23 acres site to begin the initial ground digging work. The engineering team will start building the foundations for the 22 high-rise towers right after the official launch on December 15, 2026.

This mega project will provide high-quality homes with a strict delivery deadline.

Technical Specifications and Site Blueprint

The community layout balances massive concrete residential structures with wide green zones. Below are the key data points for this upcoming township.

Master Plan Layout Summary

Feature CategoryLayout and Status Details
Project NamePrestige Falcon City Chennai
Site LocationMedavakkam - Sholinganallur Road, Chennai 600100
Total Property Size23 Acres Residential Apartment Township
Tower Structure22 High-Rise Towers (2 Basements + Ground + 14 Floors)
Total FlatsAround 2,170 Apartments
Open Green Ratio80% Area for Parks, Landscaping, and Gardens
Clubhouse Area70,000 square feet
Pre-Launch EOI DateNovember 25, 2026
Official Launch DateDecember 15, 2026
Possession TargetDecember 31, 2031
Current StatusPre-Launch Stage (RERA Applied)

Current Development Stages on the 23 Acres Land

Site Preparation and Foundation Timeline

The construction progress follows a highly structured engineering schedule to meet all government guidelines.

Full Site Mobilization

As of mid-2026, the temporary boundary fences are completely up around the 23 acres Residential Apartment land. The builder has set up engineers' offices and staff quarters on-site. Storage yards for steel bars and cement bags are fully prepared for the main launch phase.

Approvals and RERA Pipeline

The developer has already submitted the final structural drawings to TNRERA. The official RERA registration number is expected by early December 2026. No permanent concrete pouring will happen on the residential blocks until this state license is officially issued.

Model Apartment Construction

The construction team will build the physical model flats near the main road entry point very soon. These sample units will show buyers the exact room sizes, premium floor tiles, and balcony designs before the main tower structures rise.

Structural Highlights of the Finished Community

Amenities and Green Infrastructure Layout

  • Clubhouse Framework: A grand 70,000 square feet social club with an indoor gym and sports halls.
  • Rooftop Swimming Pool: A luxury leisure pool built safely on the clubhouse roof for privacy.
  • Wildflower Green Roof: A beautiful, eco-friendly plant layer to reduce heat in common areas.
  • Dual Basement Design: Two full basement levels to store resident cars away from pedestrian paths.

Frequently Asked Questions

The project is currently in the pre-launch phase. The physical land is fully cleared and ready for foundation work.

Main civil work and foundation pouring will start immediately after the official launch on December 15, 2026.

The builder targets the complete physical handover of the apartments by December 31, 2031.

The approved site plan includes 22 high-rise towers. Each tower will feature 2 basements, a ground floor, and 14 floors.

The developer has applied for official TNRERA registration. They expect to receive the active RERA number by December 2026.

The master design reserves 80% of the total 23 acres plot for landscaped gardens, parks, and tree-lined walkways.

The main swimming pool is positioned on the clubhouse roof to offer elevated views and privacy.

The pre-launch EOI booking window officially opens for buyers on November 25, 2026.

×